Phase 2 complete
What changed by the end of Phase 2
The 12B-token run finished at step 22,888. The final checkpoint reached 14.6% on HumanEval and 18.2% on MBPP, and the cooldown exposed where entity binding improved.
Phase 2 finished on November 23, 2026, after 22,888 steps and 12B additional tokens on one H100. The run took about 39 hours and 50 minutes. The last 2B tokens used a falling learning rate and a mix with more tool-use and entity-binding examples.
What the cooldown showed
The final checkpoint passed 24 of 164 HumanEval tasks (14.6%) and 91 of 500 MBPP tasks (18.2%). Before the cooldown, at step 19,000, the same benchmarks were at 11.6% and 12.6%. Final code results
At step 21,000, the held-out binding probe for new names and phrasings reached 82/112, up from 17/112 at step 19,000. The probe for new sentence structures moved from 4/70 to 6/70 over the same interval. That gap shaped the next data plan. Probe v4 results · Probe v3 results
The public checkpoints
The inference model repository serves Phase 2 step 19,000 on its main branch. The training-state repository provides the weights, optimizer, scheduler, and random-number generator state for three checkpoints. These are Phase 1 final (19,073), Phase 2 before cooldown (19,000), and Phase 2 final (22,888). Inference model · Full training states